Hydropower & River Projects
Chanju Hydroelectric Projects, Chamba
The operating Stage I and HPPCL’s Stage III works in the Ravi basin
At a glance
- Location
- Chanju and Mahed streams, Chamba district
- How to reach
- Confirm the valley approach from Chamba
- Walking difficulty
- Public approaches and designated viewpoints
The Chanju name appears in records for an operating private station and a separate HPPCL development. Check which stage a report or road sign refers to.
🌄 Location and how to reach it
Use Chamba for transport planning and ask which local road reaches the particular settlement you intend to visit. The linked projects use tributary terrain and do not share a single public entrance.
Google Maps: Map the approach
- By road: Confirm the branch and a public turnaround with a local driver. Avoid routes used for construction access unless the operator has made arrangements.
- By public transport: Check from Chamba for a connection towards the relevant valley. Make a return plan before relying on a local drop-off.
- On foot: Walk from an agreed drop-off on public village lanes. Keep away from construction vehicles and diversion structures.
⚙️ What is operating
CEA lists Chanju I as a 36 MW station with three 12 MW units commissioned in 2017. It describes the station as run-of-river with pondage. The limited storage helps it manage short changes in flow.
🏗️ What Stage III would add
HPPCL lists a 48 MW Stage III design with three 16 MW units, drawing on the Chanju and Mahed streams in the Ravi basin. CEA lists Stage III under construction. Use a dated official update for individual milestones and commissioning.
🌊 How to read the project names
The stage numbers identify different schemes. An installed capacity in an operating register and a design capacity in a construction update describe different things. Read the operator, stream and stage together when comparing records.