Hydropower & River Projects
Girinagar Hydroelectric Project, Sirmaur
The 60 MW Giri–Bata diversion in the Yamuna basin
At a glance
- Location
- Giri valley and Girinagar, Sirmaur
- How to reach
- Confirm the Girinagar approach from Nahan or Paonta Sahib
- Walking difficulty
- Public approaches and designated viewpoints
Known in CEA records as Giri Bata, the 60 MW project diverts water from the Giri to the generating station at Girinagar in Sirmaur.
🌄 Location and how to reach it
The station and the upstream diversion occupy different parts of the Giri system. Use Girinagar as the reference for the station area. If you are interested in the diversion, check the local approach separately.
Google Maps: Map the approach
- By road: Use the Sirmaur road network from Nahan or Paonta Sahib and ask which route fits the public stop you have chosen. Follow local directions rather than entering a project road.
- By public transport: Ask about connecting services towards Girinagar from the town you are using as a base. Arrange the last leg and return before setting out.
- On foot: Use public streets and permitted viewpoints. The power house, substation and water passages are operational areas.
⚙️ How the project uses the fall of the river
CEA lists two 30 MW units and records commissioning in 1978. A diversion on the Giri feeds a waterway that carries flow to the power house. The drop between intake and turbines supplies the pressure needed for generation. The station has limited pondage, so the Giri’s seasonal flow remains important.
🧭 What Giri–Bata means on a map
The name describes a scheme that takes water from the Giri system towards the Bata side. Both rivers feed the wider Yamuna basin. Seeing the intake and outlet as different parts of the same project explains why the station is listed under Giri even when the road to Girinagar does not follow the Giri all the way.
🌊 Girinagar and the Renukaji project
The Renukaji Dam works also concern the Giri, but are a separate scheme designed around water storage and downstream supply. HPPCL places the new dam upstream of the Jateon barrage of the existing Giri project. Girinagar is the operating station in this part of Sirmaur.