Hydropower & River Projects
Integrated Kashang Hydroelectric Project, Kinnaur
The operating Powari stage and the wider Kashang–Kerang plan
At a glance
- Location
- Powari and the Kashang–Kerang streams, Kinnaur
- How to reach
- Via Powari on the Reckong Peo approach
- Walking difficulty
- Public approaches and designated viewpoints
HPPCL’s operating 65 MW Kashang stage brings water from a steep tributary to an underground station near Powari. The integrated plan also includes works on the neighbouring Kerang stream.
🌄 Location and how to reach it
Use Powari on the Sutlej corridor for orientation. The intake is high above the highway. The stream valley and generating station are separate locations, with no need to approach either installation to understand the scheme.
Google Maps: Map the approach
- By road: Travel via NH5 towards Powari. Ask locally where you can stop clear of project and highway traffic.
- By public transport: Check for a Reckong Peo connection and confirm the Powari stop before boarding. Arrange the return if you plan to leave the main road.
- On foot: Use public streets and lanes. Ask HPPCL before planning any visit to a project site.
⚙️ How Stage I makes use of height
Stage I draws from the Kashang stream and brings the water to a high-head Pelton unit underground near Powari. HPPCL’s tariff filing gives a design head of about 821 metres. The steep drop lets one 65 MW unit use a smaller tributary than projects that draw directly from the Sutlej.
🏗️ What the future stages would add
The design for Stages II and III would bring Kerang water into the existing system and add generating units. Stage IV was conceived as a separate scheme upstream on the Kerang. HPPCL’s overview identifies Stage I as commissioned. Read the capacity against the stage number, because the multi-stage design includes works beyond the operating unit.
🌊 The streams and communities
When reading the project’s assessments, note where water would be diverted and where it would be returned. Those points identify which stream reaches are most relevant to discussions of water use, environmental flows and construction effects.
Sources and Further Reading
- HPPCL’s Kashang Stage I tariff petition and design figures
- HPPCL’s stages and environmental plan
- HPPCL’s commissioned project overview