Hydropower & River Projects
Kutehr Hydroelectric Project, Chamba
A 240 MW station with a 14.6 km water tunnel on the Ravi
At a glance
- Location
- Upper Ravi, Chamba district
- How to reach
- Via the Chamba–Bharmour corridor
- Walking difficulty
- Public approaches and designated viewpoints
JSW’s Kutehr project uses the fall of the upper Ravi. Three 80 MW Francis units entered service in 2025.
🌄 Location and how to reach it
Kutehr is on the Ravi in Chamba district. Use Chamba as a base for confirming the public road towards the upper valley. The map identifies the area of the project, and any access to its structures is arranged separately.
Google Maps: Map the approach
- By road: Use the upper Ravi road from Chamba and ask which public stop can be reached safely. Keep clear of tunnel portals and project gates.
- By public transport: Ask about a bus or shared ride along the Chamba–Bharmour corridor and confirm its closest public stop and return.
- On foot: Use public roads and village lanes. Contact JSW if you need access for a technical visit.
⚙️ The water’s route to the turbines
AFRY, the design consultant, describes a gated barrage, an intake and a 14.6 km headrace tunnel. A surge shaft helps manage pressure changes. The water continues to an underground station, where three Francis turbines drive the generators.
📜 Commissioning in 2025
JSW confirmed commissioning of the third and final 80 MW unit in August 2025. The dated announcement establishes 240 MW in service. Construction descriptions can still appear in earlier documents or in introductory text, so look for the date and the number of commissioned units.
🌊 Kutehr in the Ravi basin
Kutehr is one of several schemes in the upper valley. The Ravi also powers Bajoli Holi and the three Chamera stations. Keep the river’s direction and project names in view when comparing outputs or looking for an individual site.
Bajoli Holi Hydroelectric Project
Sources and Further Reading