Parbati II and III Hydroelectric Projects, Kullu

Two stations linking the Parvati and Sainj valleys

Pulga Dam on the Parbati River with Tosh village in the distance
Pulga Dam on the Parbati River, part of the Parbati II scheme.

At a glance

Location
Pulga, Suind and Bihali, Kullu district
How to reach
Via Bhuntar for the Parvati valley; Larji for Sainj
Walking difficulty
Public approaches and designated viewpoints

NHPC’s Parbati II carries river water from the Pulga side to Suind. Parbati III uses the combined flow in the Sainj valley and generates farther downstream at Bihali.

🌄 Location and how to reach it

The Stage II diversion is in the Parvati valley near Pulga. Suind and Bihali are in the Sainj valley. Use separate destinations and road approaches. The tunnel link between the valleys is a waterway.

Google Maps: Map the approach

  • By road: Use Bhuntar and the Parvati valley road for public stops on the Pulga side. Use Larji and the Sainj road for Suind or Bihali.
  • By public transport: Check buses at Bhuntar for the Parvati side or towards Sainj from the Beas corridor. Confirm the last leg independently for each valley.
  • On foot: Walk on designated paths in the public settlements. Ask NHPC before planning a visit to any operational facility.

⚙️ Stage II carries water across the ridge

NHPC describes a diversion near Pulga and a roughly 31.6 km headrace tunnel through the mountain to Suind. The large fall between intake and power house drives four 200 MW units. NHPC records 800 MW commissioned in 2025.

🌊 Stage III reuses the flow

The Stage III diversion sits on the Sainj at Suind, where the river system also receives water from the Stage II outlet. It sends water towards the power house near Bihali, where four 130 MW units make 520 MW. Stage III entered service in 2014, years before the full Stage II commissioning.

🧭 Distinguishing the projects at Suind

Suind also appears in HPPCL’s separate 100 MW Sainj project. The project number and operator are useful when following engineering records or choosing directions. The two NHPC stages together account for 1,320 MW of installed capacity.

HPPCL’s separate Sainj Hydroelectric Project