The 150 MW station commissioned on a Sutlej tributary in 2026
At a glance
- Location
- Tidong Valley, Kinnaur
- How to reach
- From the Moorang side of the Sutlej
- Walking difficulty
- Public approaches and designated viewpoints
Tidong I is an operating run-of-river station in the Tidong Valley. JSW announced full commissioning of its 150 MW in June 2026.
🌄 Location and how to reach it
Use Moorang to orient yourself on the Sutlej corridor. The Tidong valley branches inland and the project infrastructure occupies several points along it. The map locates a public settlement for planning purposes.
Google Maps: Map the approach
- By road: Confirm the public route via Moorang and the intended stopping point with a local driver. Check district guidance for travel farther into the valley.
- By public transport: Ask at Reckong Peo about the relevant Sutlej valley connection and arrange the onward and return legs separately.
- On foot: Use public village lanes and permitted routes. Leave road room for local traffic and keep clear of river and project access tracks.
⚙️ Three 50 MW units
CEA records Tidong I as three 50 MW units on the Tidong. In a project of this type, flow is intercepted at an upstream point and carried to turbines lower down. The station returns water to the drainage after generation. The availability of water affects how much power it can produce.
📜 From construction to generation
Earlier reports describe a project in development under Statkraft. JSW’s 12 June 2026 disclosure reports full commissioning after its acquisition. A current account of the project should distinguish an acquisition announcement, construction milestones and entry into service.
🌊 Tidong and the main Sutlej
Tidong drains into the Sutlej. The project draws on a tributary valley with its own flow and gradient. Nearby Sutlej schemes such as Karcham Wangtoo follow different water routes and their capacities are reported separately.